Customization: | Available |
---|---|
Media: | Oil |
Temperature: | Ordinary Temperature |
Still deciding? Get samples of US$ 50/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Before installation, ensure the compensator's specifications align perfectly with system requirements. Inspect for damage or defects. Shut down and cool the system, align the compensator correctly while avoiding excessive twisting. Secure bolts for a proper seal, ensuring free movement within design limits. Monitor for abnormal system noises, vibrations, or leaks. Conduct annual inspections for pressure, movement, and seal integrity. Operate within specified limits, avoid over-bending during installation, and clean regularly to maintain optimal performance.
Petroleum | Нефть и газ |
Chemical Industry | Химическая промышленность |
Natural Gas | Природный газ |
Power | Электричество |
Architectural Engineering | Архитектурное |
New Energy | Новые источники энергии |
Heating | Для обогрева помещений |
Hot oil,Steam | Горячее масло, пар |
Order Size | Discount for Customers | Prpayrit quired | Cash Required |
USD5000-20000 | 2%OFF | 30% | USD200/CNY1500 |
USD20001-40000 | 2%OFF | 30% | USD500/CNY3000 |
USD40001 | 2%OFF | 20% | USD1000/CNY5000 |