Customization: | Available |
---|---|
Media: | Oil |
Temperature: | Ordinary Temperature |
Still deciding? Get samples of US$ 50/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Before installation, ensure the compensator's specifications match the system requirements and check for any damage or defects. Shut down and cool the piping system, then align the compensator correctly, avoiding excessive twisting or stretching. Tighten the bolts securely to ensure a proper seal without overtightening, and confirm that the compensator can move freely within its designed range. During operation, monitor the system for abnormal noises, vibrations, or leaks at connection points. Perform an annual inspection to assess pressure, movement, and seal integrity. Always use the compensator within its specified temperature and pressure limits, avoid over-bending or stretching during installation, and clean it regularly to prevent dirt buildup that could impair its performance.
Petroleum | Нефть и газ |
Chemical Industry | Химическая промышленность |
Natural Gas | Природный газ |
Power | Электричество |
Architectural Engineering | Архитектурное |
New Energy | Новые источники энергии |
Heating | Для обогрева помещений |
Hot oil,Steam | Горячее масло, пар |
Order Size | Discount for Customers | Prpayrit quired | Cash Required |
USD5000-20000 | 2%OFF | 30% | USD200/CNY1500 |
USD20001-40000 | 2%OFF | 30% | USD500/CNY3000 |
USD40001 | 2%OFF | 20% | USD1000/CNY5000 |