Customization: | Available |
---|---|
Media: | Oil |
Temperature: | Ordinary Temperature |
Still deciding? Get samples of US$ 50/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Before installation, verify that the compensator's specifications align with your system requirements, and thoroughly inspect for any damage or defects. Ensure the piping system is shut down and cooled before proceeding. Align the compensator with precision, avoiding any excessive twisting or stretching. Securely tighten all bolts to achieve a proper seal, taking care not to overtighten. Ensure freedom of movement within the compensator's designed range. During operation, diligently monitor the system for any unusual noises, vibrations, or leaks at the connection points. An annual inspection is recommended to evaluate pressure, movement, and seal integrity. Always operate within the specified temperature and pressure limits, refraining from over-bending or stretching during installation. Regular cleaning is advised to prevent dirt buildup and maintain peak performance.
Petroleum | Нефть и газ |
Chemical Industry | Химическая промышленность |
Natural Gas | Природный газ |
Power | Электричество |
Architectural Engineering | Архитектурное |
New Energy | Новые источники энергии |
Heating | Для обогрева помещений |
Hot oil,Steam | Горячее масло, пар |
Order Size | Discount for Customers | Prpayrit quired | Cash Required |
USD5000-20000 | 2%OFF | 30% | USD200/CNY1500 |
USD20001-40000 | 2%OFF | 30% | USD500/CNY3000 |
USD40001 | 2%OFF | 20% | USD1000/CNY5000 |