Customization: | Available |
---|---|
Media: | Oil |
Temperature: | Ordinary Temperature |
Still deciding? Get samples of US$ 50/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Prior to installation, verify that the compensator's specifications align with system needs, and inspect for any faults or damages. Ensure the piping system is shut down and cooled. Properly align the compensator, avoiding undue twisting or stretching. Secure bolts firmly to guarantee a reliable seal without over-tightening. Confirm the compensator's ability to move freely within its intended range. During operation, vigilantly monitor for unusual noises, vibrations, or leaks at connection points. Conduct an annual inspection to review pressure, movement, and seal integrity. Always operate the compensator within its designated temperature and pressure parameters, avoid excessive bending or stretching during installation, and maintain cleanliness to prevent performance-affecting dirt accumulation.
Petroleum | Нефть и газ |
Chemical Industry | Химическая промышленность |
Natural Gas | Природный газ |
Power | Электричество |
Architectural Engineering | Архитектурное |
New Energy | Новые источники энергии |
Heating | Для обогрева помещений |
Hot oil,Steam | Горячее масло, пар |
Order Size | Discount for Customers | Prpayrit quired | Cash Required |
USD5000-20000 | 2%OFF | 30% | USD200/CNY1500 |
USD20001-40000 | 2%OFF | 30% | USD500/CNY3000 |
USD40001 | 2%OFF | 20% | USD1000/CNY5000 |